Type No.:MAG-Insulation Piercing multi-core Branch connectors

Installation and Effect photo

 

 
1. Peel off insulation layer of main line 150-200mm (according
to sectional area of cable).separate the cores from each other.
4.Pell off insulation coat of branch cable 20mm,then lead it into
hole of ring connector, then tighten a bolt by inner hexagon
spanner with 4mm opposite-side.
2. Put the mid islated sprag into gap among the cores of the
cable, then put second sprag into the gap between another
sides of cores, lead the cores into the centre of isolated sprag.
5. Screw torque nuts equally by inner hexagon spanner with
6mm opposite side only two cycles a time. Don't stop screwing
until the cap of the torque nuts is screwed off.
3. After determining centre of ring connector according to positio
of mid isolated sprag, place cores of the main cable into ring
conector, then tighten hexagon socket head cap.
6. Caver the ring connector with cables by a insulation plastic
cover. Fill the gap between the caver and the ends of the plastic
cover, then install it after the insulation oil is frozen.